Integrated solutions for gas industry
GTU - 32 «Ladoga»
GTU-32 "Ladoga" is a technologically advanced product in terms of production capacity and technology. This unit is made as a stationary machine of 32 MW Class, created on the basis of the licensed Italian turbine – the new generation machine MS5002E designed for any operating conditions, with high efficiency (36%) and low emissions (NOx = 18 ppm), long service life, good maintainability.
The first 3 gas pumping units "Ladoga" will be delivered in the 4th quarter of 2009 to the compressor stations “Vavozhskaya" and "Gryazovets" (OAO “Gazprom”) within the frames of these stations reconstruction.
Next 16 machines are intended for installation at the compressor stations of the gas trunk line under construction "Bovanenkovo - Ukhta: CS-6 "Intinskaya", CS-7" Syninskaya ", CS-8" Chikshinskaya ", CS-9 "Maloperanskaya. 12 units will be delivered in the 3rd – 4th quarter of 2010, and the remaining 4 units - in the 1st I quarter of 2011
On the basis of the new turbine CJSC “REPH” offers package solutions for:
- Compressor stations (CS) for gas trunk lines;
- Combined heat and power plants, central combined heat and power plants (consisting of combined-cycle plants);
- Shipbuilding (Main propulsion plants for ships);
- Combined-cycle power plant.
 |
 |
GTU-32 "Ladoga" in “Nevsky Zavod” workshop |
Download description and technical features of GTU– 32 LADOGA
Download description and technical features of gas turbine unit (Based on GTU– 32 LADOGA)
Download description and technical features of combined heat and power plant (Based on GTU– 32 LADOGA)
Comprehensive Modernization of Gas Pumping Compressor Stations.
Project: CS «Smolensk»
REP Holding has developed the project of comprehensive modernization of the “Smolenskaya” compressor station (CS) (gas pipeline "Yamal-Europe"). The project provides for replacement of 10 existing units by 5 units of new generation, replacement of all service lines, monitoring and control systems. In 2008 implemented was the first phase: demolition of two old units and installation of an electrically-driven gas-pumping unit (EGPA) designed and manufactured by CJSC "REPH".
Modern EGPA is a sophisticated unit combining the latest engineering development and advanced manufacturing and technological capabilities.
CS «Smolenskaya», gas trunk line «Yamal-Europe»
The delivered unit consisted of:
- High-speed induction motor of HSHV type with the rotor magnetic bearing.
- Centrifugal compressor 208-21-2ENI with magnetic bearing (under the license of «S2M»).
- Frequency converters with liquid cooling (under the license of «Converteam»).
- Automatic Control System ACS EGPA ELESKU-6000-01.
- Fire – fighting system
- Instrumentation
Competitive advantages:
- Application of frequency-controlled electric drive, without gear;
- More sophisticated and reliable algorithms for monitoring and control;
- Full automation of the equipment;
- Compliance with up-to-date environmental requirements;
- Packaged supply
Packaged Supply of Gas-Pumping Unit based on Gas Turbine Drive
Project: CS «Ukhtinskaya»
In 2007 was adopted the project for modernization of CS "Ukhtinskaya" (Co Ltd. “Gazprom transgaz Ukhta") developed by CJSC “REPH" which provided, without replacing the foundation of the GTK-10, for installation of a new, more powerful and modern machine to compress supply gas into the gas trunk line.
The following equipment was installed at CS "Ukhtinskaya" :
- GTNR-16gas turbine;
- natural gas compressor of new generation;
- filter house;
- oil supply system;
- automatic control system;
- instrumentation;
 |
GTNR-16 rated at 16 MW
The newly developed turbine rated at 16 MW, designed to replace the out-dated machines GPA GTK-1010 MW rated at 16 MW |
CS «Ukhtinskaya»,
gas trunk line «SRTO-Torzhok». |
|
| In 2008 CJSC «REPH» acquired a license from the American company General Electric to produce gas turbine MS5002E, 32 MW, of a new generation, which will replace the outdated equipment at Gazprom facilities in the nearest future. |
 |
MS5002E Turbine
produced under the license from General Electric Oil & Gas with complete transfer of technology to CJSC “REPH ", delivered as a package. |
| MS5002E Turbine |
|
The advantages of the package installation of the new units:
- High efficiency up to 36%;
- environmental measures improved by 20%;
- reduced time of installation;
- unmanned operation;
- turbine of the latest generation;
- "turnkey" delivery.
INTEGRATED SOLUTIONS FOR GAS COOLING Gas air-coolers
Gas air – coolers are designed for cooling natural gas at compressor stations of gas trunk lines.
 |
CJSC ”REPH” has started implementation of the package supply of gas air-coolers: designed and manufactured has been valve electric drive AI-40 rated at 40 kW for gas air-cooler.
Gas air-cooler |
| Gas air-cooler |
|
Advantages of the gas air-cooler:
- reliability and long lifetime;
- high specific characteristics;
- the possibility of regulating the motor speed.
- high efficiency;
- Excellent linear mechanical characteristics;
- start by underfrequency relay frequency start and constant-speed regulation of the motor.
Integrated solutions for the metallurgical industry
Turbocompressor unit for blast furnaces
Project: JSC «MMK named after Ilyich»
In 2008 CJSC "REPH" supplied to JSC "Magnitogorskiy Integrated Iron-and-Steel Works” the turbocompressor unit TKA 4200/19 designed to supply compressed air into the blast furnace.
 |
Steam turbine K-19, control system, instrumentation, JSC "Azovstal", Ukraine, Mariupol |
| JSC "Azovstal", Ukraine, Mariupol |
|
Scope of the unit supply:
- air compressor K-5500;
- drive condensing steam turbine K-19;
- automated control system (AMSC);
- power supply system;
- instrumentation
Competitive advantages:
- compliance with up-to-date environmental requirements;
- improved noise and vibration characteristics;
- Automatic control;
- Significantly increased operational efficiency;
- Compressor design using a welded casing
Integrated solutions for power generation
Mobile Modular Substation (MMSS)
Project: Substation No. 124
In 2007 a mobile modular substation developed and manufactured by CJSC "REPH" enterprises was supplied to OJSC "Lenenergo" substation No.124
 |
Scope of MMSS supply:
- high voltage module;
- power transformer module;
- medium voltage module;
- control system;
- conditioning system
- container
|
OJSC "Lenenergo" substation No.124. |
|
Competitive advantages and purpose:
- operational power supply in case of emergency shutdown of the main substation;
- malfunction repair, technical maintenance;
- operational power supply for new projects;
- power supply for sites where stationary substations will be not-paying;
- short-time increase of the existing facility power at peak loads.
INTEGRATED SOLUTIONS FOR POWER GENERATION
Project for automation and delivery of frequency - variable motor systems,
Project: JSC "SIBUR Holding”
In 2008 completed was a large project for the introduction of frequency regulation systems for electric motors at the enterprises belonging to the JSC SIBUR Holding ": JSC "Voronezhsintezkauchuk", JSC "Novokuybyshevskaya Petrochemical Company”, LLC "Togliattikauchuk.
The following work has been included into the package supply:
- development of the automation project;
- development of the frequency converter control system;
- construction and erection and pre-commissioning work;
and the following equipment:
- frequency converter Perfect Harmony (Robicon);
- power equipment K-207 EP;
- air conditioning system;
- block-container.
Competitive advantages:
- Reduced energy consumption down to 50%;
- Soft start, significant increase in the motor service life.
Integrated solutions for nuclear power industry
Full-scale simulation training system for nuclear power plant
Project: Kudankulam NPP (India)
In 2007 manufactured was a full-scale training simulator for power units of the Nuclear Power Plant intended for professional training of the operational staff of the block control panel (BCP) and the reserve control panel (RCP), using a full-scale model of the real BCP and RCP and the integrated unifying all-duty model operating in real time.
Mosaic board of the Relay Protection, Monitoring and Control system of the el. equipment
Relay protection with Siprotec terminals
 |
 |
| Mosaic board of the Relay Protection of Control Power System in Electrical Part |
Relay protection cabinets with terminal boxes Siprotec |
Competitive advantages:
• Compliance with current requirements for operation;
• Improved quick-action reliability and safety characteristics;
• much higher efficiency. |