31 January 2017

“REP Holding” shipped compressor equipment for booster complex to Urengoy oil, gas and condensate field

"REP Holding" advance in schedule shipped four sets of compressor bundle 155SСПЧ10/76-2.2S to one of the objects to the Yamalo-Nenets Autonomous Okrug. The compressor equipment designed and manufactured by the order of LLC "Gazprom dobycha Urengoy " within the frames of program on modernization of the objects, which is realized by the enterprise.

Compressor bundle will be installed at the booster compressor station BCS 1AV in Urengoy oil, gas and condensate field as the set of gas-pumping units GPU-10 “Ural” with gas turbine the composition of gas pumping units GPA-10 "Ural" with gas turbine drive ПС-90ГП-3.

The compressor equipment manufactured by "REP Holding" is designed with "dry gas-dynamic seals” that will prevent the leakage of natural gas from the compressor, and will improve the environmental, operational parameters of the unit.  
The using of compressor bundle parts will provide the project a level of gas production  and gas condensate in conditions of liquefaction formational pressure, which today Urengoy field is characterized.

This is not the first order realized by "REP Holding" according the modernization program of LLC "Gazprom dobycha Urengoy" objects. Three compressor bundle have already put into commercial operation. By the end of this year it is planned to supply other three sets.

Back to the news